![]() |
||
| > SFCA Home | Search | > Amended Claim 3252 | > Original Claim 3252 | > Claim 3252+ Summary | > Claim 3252 Maps | ◄► |
| No. of Claim | Name of Claimant | Description of Claimant | Address of Claimant | ||
| 3252 | Robert William Marshall | Paper Manufacturer | Owlerton Mills, near Sheffield |
| Nature of Claimant’s Interest | Particulars of Claim | Amount of Damages Claimed | ||||||
| As Owner, Lessee and Occupier | 4 Oil Cans with Spouts | 4s | ||||||
| 4 Hand Bowls | 8s | |||||||
| 3 Felt Stools | 12s | |||||||
| 1 Large Beam and Scales | £9 | 10s | ||||||
| 1 Large Beam and Scales | £4 | 10s | ||||||
| 2 Smaller Beams with Scoop Scales | 45/. Each | £4 | 10s | |||||
| Extra Engine Plate (G.H.) | £3 | |||||||
| 6 New Brass Brushes 20 lbs | 1/3 | £1 | 17s | 6d | ||||
| 3 Oil Bottles | 3/. | 9s | ||||||
| 1 Sett Hammers and 7 Chains | 7s | |||||||
| Lot of Brass 14 lbs | 2s | 4d | ||||||
| 3 Boxes and Sundry Irons in them | 7s | |||||||
| Fender and Fire Irons | 4s | 6d | ||||||
| New Brass Plate for Rolls | 2s | |||||||
| 1 Tin Grease Box 3/. And stool 1/3 | 4s | 3d | ||||||
| 1 Metal Pipe 72 lbs 7/6 and Iron Skip 2/6 | 10s | |||||||
| Brass Tap | 3s | 6d | ||||||
| 3 Baskets | 5s | |||||||
| 4 Rope Axes | 4/. | 16s | ||||||
| Long Brush and 2 Buckets | 8s | |||||||
| 1 Hand Bowl | 2s | |||||||
| 3 Large Size Tubs and Bridge | 12/. | £1 | 16s | |||||
| 3 Casks 3/. And Stone Trough | 3/6 | 6s | 6d | |||||
| 2 Tool Boxes and Grease Tub | 6s | |||||||
| Fire Shovel and 2 riddles | 5s | |||||||
| Old Iron Cwt 2.2.18 | 3/. | 8s | 3d | |||||
| Hand Scoop and 2 Baskets | 1s | 6d | ||||||
| 1 Bucket | 2s | 6d | ||||||
| 1 Pitch Kettle and Fire Box | 7s | |||||||
| 1 Metal to the same | 4s | |||||||
| Iron Plate and Fender | 2s | 6d | ||||||
| 1 Rope Axe 3/6 Wire Riddle 2/6 | 6s | |||||||
| 1 Grease Box | 1s | |||||||
| 4 Tubs and 2 Wood Boxes | 2s | 6d | ||||||
| Fire Irons, Shovel etc. | 2s | 6d | ||||||
| 1 Tin Bowl | 2s | |||||||
| 4 Brass Brushes 34 lbs | 1/. | £1 | 14s | |||||
| 1 Metal Press, Top and Bottom, Press Screen, 4 Screw Bolts, 4 Iron Bars, Bridge and Catch | £18 | |||||||
| 1 Boiler 6 ft x 2 ft 8 | £15 | |||||||
| Lot of Empty Holders and Casks | £1 | 5s | ||||||
| 3 Large Rope Hampers | 7s | 6d | ||||||
| Copper Pipe for Conveying Water to Copper Barrel and Pans 12lbs | 1/6 | 18s | ||||||
| Pitch Pine Plank 20 ft 11 x 3 | 5d | 8s | 4d | |||||
| [Total for Stock Working Tools etc.] | £517.15.1 | |||||||
| Switons Cottage | ||||||||
| Piggeries | ||||||||
| Hen Shed in Orchard | ||||||||
| Old Mill | ||||||||
| Copy of Mr. Powells Contract for rebuilding and restoring the foundations, Walls, Boundary Walls, Fence Walls, Goits, Weir, Culverts, Arches, Ashlar and Building Sol and Drying Loft, Cottages, Sheds, Privy, Piggeries, Pitching Mill, at Owlerton as it was before the Flood of 12 March 1864 belonging to Mr. R. W. Marshall and Cleaning out Small Dam | ||||||||
| Foundations and Walls to Small Dam and Topped with Walls dry Rubble the toppers rough flat ones in Mortar. West Boundary fence Wall built in Mortar and topped Cock Hat Toppers the height and thickness as before. Dry rubble fence Walls coped with rough flat coping in Mortar. Wall next River built of large Rubble Stone and Coped with rough flat coping in Mortar. Excavations for foundations and River Bed. Dry Rubble Wall from Cart Road to Culvert next the River and Coped with rough flat coping in Mortar. Dry Rubble Wall form large Chimney to Soil Goit coped with rough flat coping in Mortar. Rock faced Wall from Large Chimney to Culvert to the level of Yard and 10 inch Stock Brick Fence on the top. Dry Rubble Walls to the Culvert Sides. Arch to Culvert turned with Stones in Mortar and backed up to the Crown of Arch with rubble Stone and Wood Centres and Covering. Dry Rubble Wall from the top end of Culvert to Weir in Small Dam 10 inch Stock Brick Arch to Top end of Culvert. Ashlar Stone to rework and reset at the Weir and Shuttle of Small Dam. Rubble work inside of Weir in flat crevices in Small Dam. 1 Batten Door to be hung with Bands and Hooks and lock and felt marking place. Wood Runners 7 x 3 Crosspieces 6 x 4. 4 Stirrup Irons 15 holes in Each. 4 Iron Staples & pins and fixing for felt washing place and under Arches. Wrought Iron Grate at the top end of Arch under Sol in the Small Dam. 10 Inch Stock Brick Arch over the Goit to Old Mill. Rubble Walling to side Walls and backing of Arch. 10 Inch Stock Brick Wall in the top of Arch to fence the Goit topped with brick on edge. Dry Rubble Foundation Wall to the sides of Goit along side of Sol and Drying Loft. Ashlar Stone to rework and reset and deficiency to make up from 10 Inch Brick Arch to Water Wheel of Old Mill. Wood Floor, Joists, and Boards over the Culvert inside Sol Joists 4½ x 3 and 1 Inch Boards |
||||||||
| Painting Shed below Old Mill | ||||||||
| 10 Inch Stock brick Walling to outer Walls, Chimney Breast and Chimney Flue the height of the ridge of the Old Mill Over the Bridge. Jambs and Mantle and Setting self faced flags to floor, squared and laid. 1 Inch Batten Door and door frame hung with Bands and Hooks. 2. 4 Light Sash Windows. Paint Wood Work, Glaze the Windows with Crown Glass. Wood Roof, pans, principles, side trees and Spans slated with Grey Slate and pointed with hair and lime. Collaring and beam filling. 1 Cylinder Boiler fixing on brick pins inside the painting shed for Water Cistern | ||||||||
| Large Chimney | ||||||||
| Square Stone basement to the level of Yard. 13 Inch Stock Brick walling to square part of Chimney 10 Inch Stock Brick circular walling. Ashlar Casement course on the top of square brick work for foundation of Circular Brick Work. Ashlar Stone on top of Chimney. Worked Circular | ||||||||
| Shed Next Old Mill | ||||||||
| 10 Inch Brick Walling. Wood Roof and Spouts covered with Tiles. Floor flagged with self faced flags, squared and laid. | ||||||||
| Shed Over Boiler | ||||||||
| 10 Inch Brick Walling. Wood Roof, pans, principles, side trees, spans and spouts. Roof covered with Tiles. Wood floor Joists 4½ x 3. 1 Inch floor boards the top end boarded up. Reset large Boiler, form Flues and Coal Place. Door and Frame for Coal Place. 1 Large Pan Sitting in foundation to connect to Steam Pipe. 1 Large Pan sitting in Brick Work Next the large Chimney. 1 Large Pan to Cottage Channel Stones from Pan to River. Levelling up the Boiler Yard and Sheds. Self faced flagging squared and laid in Boiler Yard. Channel stones along the Yard to Goit edge stones and Self faced flagging squared and laid from Sol to Goit | ||||||||
| Bradburys Cottage | ||||||||
| Taking down that part shaken off the Wall and rebuild and make good as far as required. Take down the Chimney breast and Chimney rebuild. Chimney piece to repair and reset. Oven and Range to repair and reset. Stone floor to reflag. Repair and reslating Grey Slates. Roof repairing. Wood Roof. Spouts and Conductors. Set Pot Setting in Brickwork and Stone Curb. Plastering Ceiling & Walls and White washing. Repairing Cupboard under Window. 2 Sash Gut. Casement Sash Gut Window and frame. 1½ inch Batten Door hung with Bands and Hooks, handle and lock. ¾ Inch Batten Door to foot of Chamber Stairs. 1 Inch Batten Door to Kitchen. Handles and Snecks. Repair Wood Spandril and door under stairs. 1 Window to Kitchen. Wood Shelves in Kitchen fixed on bearers. Repairing Cupboard Plinths inside Rooms. Glazing Windows with Crown Glass. Painting the wood work. Papering the Room etc. | ||||||||
| Built of Dust Stone on front and 1 end. 10 Inch brick Walling to back and one end. Length 39 feet 4 x 15 feet 6 inches x 17 feet high from floor to pan. 5 Inch Brick Walls inside Staircase in Kitchen. Pantry under Stairs, Low rooms flagged with faced flags, Squared and laid. 2 Chamber Chimney Pieces and Stove Grates. 1 Low Room Chimney Piece and Stove Grate. 1 Oven Range, Jambs, Mantle Piece Shelf Chimney Breasts and Chimney Flues. Slopstone in Kitchen, Sough from Slopstone to River. Stone Table in Pantry, Set Pot and Setting in Brick Work. Wood Roof. Pans, side trees, principles, spans, spouts and Conductors. Covered with grey slates. 2 Cupboards in Rooms, plinth in low rooms and Chambers. Angle beads to all external angles. Sashes to Window Bottoms and shelves in the Pantry. Door and Door Casings to low rooms 1½ inch thick moulded on one side hung with bute hinges. Handles, Lock etc. 4. 3 Light Sash Gut Windows with Casements. 1. 2 light Sash Gut Windows Glazed with Crown Glass, Shutters to Windows hung outside with bands and hooks, cotters etc. Paint all Woodwork required to be painted, Plaster Walls with Ceiling 2 Coats. Whitewash the Walls and Ceilings and paper the Walls. | ||||||||
| Size House in Orchard | ||||||||
| Petty to Cottages | ||||||||
| Built of Coarse Rubble stone in Mortar. Length 7 feet x 5 feet. Plastered inside. Covered with cover stones in Grey Slates. 1 Inch Batten Door and Door Frame hung with bands and hooks, handle and bolts, self faced flags to floor, squared and laid seat stone and wood seat and wood fall to seat. Paint Door and Door frame | ||||||||
| 2. 2 Light Sash Gut Windows and Casements Glaze with Crown glass and paint the woodwork. 1 Stone Sill and Wall up underneath sill. 1 1 light Sash gut Window with Casement. Paint Woodwork and Glaze with Crown Glass. 1¼ Inch Batten door and Door frame hung with bands and hooks Handle etc. 1 Inch Batten door hung One Shelf on Wood bearers | ||||||||
| Steps to Chamber in Old Mill | ||||||||
| 7 Stone Steps to rework and reset. 1 Landing at the top. Brick Spandril underneath the ends Wood Hand Rail, Iron Work Lead and fixing | ||||||||
| Sol and Drying Loft | ||||||||
| 10 Inch Stock Brick Walls Length 70 feet x 20 feet. 6 Inches Wide. 17 ft 6 Inches from floor to pans , foundations to Same. Wood Roof. 5 pairs of principles pans spans, side trees, Spouts and Conductors. Chamber Floor 5 beams to carry floor joists. Joists 4½ x 3 Inch. 1 Inch Floor boards grooved and tongued and nailed to joists. Low room floor half joists and boards and half flagged with strong self faced flags squared and laid. 1 Pair Entrance Gates. 2½ Inch thick framed and battened and door hung back with bands and hooks, Iron Bolts and Lock. Wood Beam to carry Brickwork above. 1 pair of folding doors inside Gateway to Sol. 2 Inch framed and battened and door frame hung with bands and hooks, handle and bolts etc. Wood Beam over Gateway at the Back to carry Brickwork above. 1 Inch Batten Door and Door Frame hung with bands and hooks, handle and lock. 2. 3 Light Sash Gut Windows with Casements, Glaze with Crown Glass and Paint Woodwork. 14 Sets of Lower Boards and frames in Drying Loft with Irons to open and shut. 1½ Batten Door and Door Frame at the top end, hung with bands and hooks, handle and Lock. 12 Stone Steps and Brick rises to Drying Loft. 1 Landing to to Drying Loft Brick Spandril Walls at the ends of the Steps. Wood Handrails and Iron Work, lead and fixing. 2 Doors and Door Frames for Hen Place and Rabbit Place, hung with bands and hooks and locks and fastenings. Fire Place in Sol. Oven Range, jambs and mantle and Shelf. Chimney Breast and Chimney Flue. 21 Upright from floor to principles. 12 times 69 feet 2. of Wood runners to carry hanging rods 9 feet 6 inches long. 6 Wood Guard Blocks to Corners of Walls inside Gateways and Wood Curb to keep Carts of the Walls. Paint all the Woodwork required, Cover the Woodwork with Grey Slates, Shutters to Windows, hung with bands and hooks and Cotters etc. etc. Cleaning out Small Dam and Wheeling the rubbish out on to land next the River (where washed away) Clear out Goit from the Water Wheel of Old Mill to River. Clean the Walls of Old Mill and Whitewash, Paint the top. White Wash the Walls of the Sol. Door and Door Frame to the Engine from Sol hung with bands and hooks and fasteners. Steps out of Old Mill Yard to Water Wheel race to Ashlar Bulk. Door and Door Frames and Gate Bars and bearers to 3 large Pans that are to be set in Brickwork. Wood and Iron Work across the Water Wheel race to get to Water Wheel and fastened to Ashlar Bulk. James Powell £1310.10.9 |
£1310 | 10s | 9d | |||||
| Copy of Mr Wilsons estimate of Work etc. required to be done at Mr Marshalls Paper Mill at Owlerton, Occasioned by the Flood. March 12th 1864 | ||||||||
| 3 Metal Plates to pentrough Cwt 10.2.0 | ||||||||
| 26 Bolts 12 lbs | ||||||||
| Grease Boxes to each end | ||||||||
| 7 Oak Stays to Washboards. 14 Inch long 3 x 3 each | ||||||||
| Grate Bars Repairing | ||||||||
| Copy of Estimate of Damage done to Furniture etc. by the Flood belonging to R. W. Marshall at Owlerton, March 12th 1864 by W. Johnson & Son, 82 Fargate Sheffield | ||||||||
| (The Original in the hands of Water Company) | ||||||||
| Dining Room | Damage to 4 Mahogany Chairs | £1 | 5s | |||||
| Damage to 1 Mahogany Rocking Chair | 16s | |||||||
| Damage to 1 Mahogany Dining Table | £1 | 12s | ||||||
| Damage to 1 Mahogany Couch | £2 | 12s | ||||||
| Damage to 1 Mahogany Ottoman | 14s | |||||||
| Damage to 2 Mahogany Hassocks | 5s | |||||||
| Damage to 1 Mahogany Workbox | 7s | 6d | ||||||
| Damage to 2 High Backed Chairs and Cushions | 14s | |||||||
| Damage to 1 Fender and Fire Irons | 12s | 6d | ||||||
| Damage to 1 Carpet | £2 | 15s | 6d | |||||
| Damage to 1 Hearthrug | 8s | 6d | ||||||
| Damage to 2 Pairs of Window Curtains | £2 | 6s | ||||||
| Damage to Paper | £2 | |||||||
| Damage to Painting | £1 | 9s | ||||||
| Damage to Carpet | £2 | 12s | ||||||
| Damage to Hearthrug | £1 | 6s | ||||||
| Damage to Fender and Fire Irons | 14s | |||||||
| Damage to Paper and Painting | £2 | 15s | ||||||
| Damage to Floor Cloth (passage) | 15s | |||||||
| Damage to 4 door Mats | 12s | |||||||
| Damage to Carpet Kitchen | £1 | 5s | ||||||
| 1 Set of Dinner Mats | 5s | 6d | ||||||
| Damage to Easy Chair | 7s | 6d | ||||||
| Damage to Front and Kitchen Door | 15s | |||||||
| [Sub total] | £24.4.0 | |||||||
| 1 Pair Steps & 4 Pairs of Scissors 10/. 2 Shovels and Tilly 2/9 | 12s | 9d | ||||||
| Things discovered to be lost (omitted from the above) | ||||||||
| Cabinet Piano Forte Spoiled | £45 | |||||||
| Music Stool Injured | 5s | |||||||
| Music Books Injured 30/. Music Box 10/. | £2 | |||||||
| Paid to Mr. G. Lee for examining Piano | 5s | |||||||
| [Total for Clothing etc.] | £75.16.7 | |||||||
| Sheffield Water Works Company | ||||||||
| Large Fruit Trees, Fences, Greenhouse, and Greenhouse and Bedding Plants. Bulbous and Herbaceous roots. Gooseberry, Currants, Asphalt Walks. Seed Potatoes. Trellis Work. Vegetables and large deposit of Sand. Stone and Mud etc. to remove in the Gardens belonging to Mr. R. W. Marshall of Owlerton. Valued by me this 31st March 1864 to the amount of Seventy Seven Pounds Thirteen Shillings. Henry Silray, Handworth |
£77 | 13s | ||||||
| Mr Silray's Charge for Valuation | £2 | 2s | ||||||
| Mr Silray's Charge for Writing out particulars as required by Mr. Eadon | 7s | 6d | ||||||
| [Total for goods Valued and Charges] | £80.2.6 | |||||||
| Particulars of Clothing etc. etc. lost in the Flood belonging to Mr. R. W. Marshall | ||||||||
| 1 Silk Dress £2.10.0 and 1 Silk Jacket 15/. | £3 | 5s | ||||||
| 2 Felt Hats 4/. 2 Boys Caps 7/. & 2 Ties 2/. | 13s | |||||||
| 4 Pinafores 5/. 5 Pairs Stockings 7/. 1 Pair Stockings 2/6 | 14s | 6d | ||||||
| 1 Pair Stays 4/. 2 Moreen Skirts 5/. & 1 Stuff Frock 6/. | 15s | |||||||
| 7 Pairs Boots 40/. 3 Glass Cloths 1/6 & 5 Towels 2/. | £2 | 3s | 6d | |||||
| 5 Boys Collars & 4 Fronts & 7 Collars | 13s | |||||||
| 2 Lengths of Embroidery 3/. 2 White & 1 Coloured Blind | 9s | |||||||
| 1 Silk Umbrella | 6s | 6d | ||||||
| 1 Barrel Beer 11/4 2 Pieces of Beef 8/. | 19s | 4d | ||||||
| 1½ dozen Old Port Wine 43/. | £3 | 3s | ||||||
| 2 dozen and 7 Sherry Wine 40/. | £5 | 3s | 4d | |||||
| 10 Bottles Gin 13/. £1.1.8 7 Bottles Rum 18/. £1.1.0 | £2 | 2s | 8d | |||||
| 2 Bottles Whisky 18/. 0.7.0 4 Bottles Brandy 36/. £1.4.0 | £1 | 11s | ||||||
| 2 Water Pots and Pancheon 5/6 Water Barrels on Carriage etc. 27/. | £1 | 12s | 6d | |||||
| 2 Buckets 1 Slop Pail 1 Water Can | 13s | 6d | ||||||
| 1 Maiden Tub & 2 Wash Tubs 17/. Brushes and Dove Mat 13/. | £1 | 10s | ||||||
| Sundry Payment and repairs done to Cottages and House at Owlerton occasioned by the Flood and Mr. Wilsons charge for making out Contract taking dimensions and making calculations of Cost of repairs etc. (see specification) | ||||||||
| 1864. March 12 | Paid 4 Men and 3 Women for Cleaning out Rooms and Cellars of my House | 15s | ||||||
| Paid for Window Glazing in House & Cottages | 12s | |||||||
| April 2 | Paid R. Roach for rebuilding R. Olivers Pantry (see rent account) | 17s | ||||||
| Paid Primrose for Perforated Zinc for Olivers Pantry Window | 1s | |||||||
| March 14 - 17 | Allowed R. Oliver for Cleaning his Cottage. See Rent Account | 7s | 6d | |||||
| Mr. Wilsons Account for Repairs to Cottages etc. Getting Press out of Goit taking up my Sitting Room Floor and taking dimensions of Work and Making Calculations of Cost of Repairs etc. (see bill annexed) | £5 | 11s | 0½d | |||||
| Copy of Mr. Wilsons Account for Repairs | ||||||||
| Mr. Marshall. Debtor | To Alfred Wilson | |||||||
| For Joiners Work etc. at Owlerton occasioned by the Flood | ||||||||
| 1864 April 2 | 25 Feet of deal Board 4/7½ Nails 1/3 | 5s | 10½d | |||||
| 2½ dozen Screws ½ Springs 1/. 1 Catch 2d | 2s | 4d | ||||||
| Brass 2lbs @ 4d 1 Hook 1 lb 5d | 1s | 1d | ||||||
| Joiner 5½ days at 5/. Repairing Cottages | £1 | 7s | 6d | |||||
| 30[th] | 1 Frame 14 Inches x 18 Inches | 2s | 6d | |||||
| May 7 | 2 Millwrights 2¼ days at 5/. Getting Press out of Goit and Cistern | 11s | 3d | |||||
| 21[st] | 1 Drill Sharpened 3d 1 Scraper 1 lb at 5d | 8d | ||||||
| 300. 8d Nails Screws 1d | 2s | 1d | ||||||
| Joiner 1 day 5/. At Mr. Marshalls Room Floor taking up | 5s | |||||||
| 3 Small Bolts | 9d | |||||||
| 1 Millwright ¼ day repairing Cistern | 1s | 3d | ||||||
| The Sheffield Water Company. Debtor | ||||||||
| For Stock Working Tools etc. lost by the Flood from the Paper Mills. March 12th 1864. | ||||||||
| Not Included in Mr Wilsons Valuations | ||||||||
| 42 Reams H. G. Paper | 1966 lb @ 4½d | £36 | 17s | 3d | ||||
| 26 Reams No. 3 Paper | 1473 lb @ 4½d | £27 | 12s | 4½d | ||||
| 11½ Reams No. 2 Paper | 878 lbs at 3½d | £12 | 16s | 1d | ||||
| 5 Reams Tissue Paper 20 x 30 | 20/. | £5 | ||||||
| 38 Reams Tissue Paper 20 x 26 | 17/. | £32 | 6s | |||||
| 10½ Reams No. 1 Paper | 954 lbs @ 3d | £11 | 16s | 3d | ||||
| 4 Reams thin for Waterproofing | 220 lbs @ 3d | £2 | 15s | |||||
| Glazed Boards for pressing | 896 lbs @ 6d | £22 | 8s | |||||
| Ropes workup [?] up since the above were weighed up (from W. & J. Astrops to 11 [?]) | ||||||||
| 68.3.1 Ropes | ||||||||
| 17.3.16 Waste in Making | ||||||||
| 50.3.13 of Paper = 3697 lbs at 4½d | £106 | 16s | 4½d | |||||
| New Set of Account Books. Notes. Cards etc. | £3 | 10s | 7d | |||||
| Part Bag of Glue 3 qrs | 42/. | £1 | 11s | 6d | ||||
| 4 Reams of Writing Paper used in above | 5/. | £1 | ||||||
| Pans and Brushes for Making Waterproof Paper | £1 | |||||||
| Boiled Oil 1½ Gallons | 6s | 9d | ||||||
| Rape Oil 1 Cwt | 46/. Jar 5/. | £2 | 11s | |||||
| Dryer 28 lbs | 5d | 11s | 8d | |||||
| Ground Ochre 36 lbs | 10s | 3½d | ||||||
| Alum 13 Cwt | 8/9 | £5 | 14s | |||||
| Brass 187 lbs | 1/. | £8 | 7s | |||||
| Set of Felts 24 Inches Wide 6 quires, 144 yards | 2/6 | £18 | ||||||
| Set of Felts 26 Inches Wide 5 quires, 120 yards | 2/9 | £16 | 10s | |||||
| Set of Felts 30 Inches Wide 3 quires, 90 yards | 3/. | £13 | 10s | |||||
| Lot of Old Felts | for Tissues and Packs | £10 | ||||||
| Pearl Ashes | 6.0.0 9/. | £2 | 14s | |||||
| 2 Casks Rezin | 8.3.16 29/. | £12 | 17s | |||||
| 1 Pair Moulds | 19½ x 27 | £3 | 4s | |||||
| 1 Pair Moulds | 21½ x 27½ | £3 | 9s | |||||
| 1 Pair Moulds | 21½ x 33½ | £4 | 8s | |||||
| 1 Pair Moulds | 23½ x 33½ | £4 | 12s | |||||
| 1 Pair Moulds | 25½ x 35½ | £5 | 10s | |||||
| 1 Pair Moulds | 25½ x 37½ | £5 | 16s | |||||
| 1 Pair Moulds | 22½ x 30½ | £4 | 2s | |||||
| Lettering the above | 11/6 each | £4 | ||||||
| Lot of Old Moulds | £1 | |||||||
| Steel Bars taken from Engine 1 Cwt | 56/. | £2 | 16s | |||||
| Large Box made of Engine Boards with Sack of Sharps | £1 | 7s | ||||||
| Joiners Tools, Chest Complete Millwrights Tools, Chest Complete | £4 | 10s | ||||||
| Quantity of Oak, Waterwheel Arms, 40 St..ts [?] Oak Planking & Beams, Waterwheel Buckets etc. | £5 | |||||||
| 4000 Paper Labels | 5/. | £1 | ||||||
| 16 Fowls | 2/6 | £2 | ||||||
| Moulds for making Hydraulic Press Leathers with Hoops and Blocks | £2 | 10s | ||||||
| Neats foot Oil | 3s | |||||||
| Coals 3 Tons and Leading 2 Cwt 5/10 1 at 10/. | £1 | 8s | 8d | |||||
| Patent Mangle in Sol | £2 | 10s | ||||||
| Childs Carriage | £1 | 1s | ||||||
| 2 Oil Lamps and Safety Lantern | 6s | |||||||
| Cask of Cog Grease Cwt 2.2.0 | 20/. | £2 | 10s | |||||
| 50 Fire Bricks | 4s | 2d | ||||||
| Metal Plate Cwt 2.2.0 | 8/. | £1 | ||||||
| 2 Grindstones | 6/. | 12s | ||||||
| 50 Yards Gas Service Pipes to take up | 1/. | £2 | 10s | |||||
| 10 Yards Gas Service Pipes to restore | 2/3 | £1 | 2s | 6d | ||||
| 25 Yards Gas Service Pipes 1 in Lead | 2/6 | £3 | 2s | 6d | ||||
| 13 Yards Gas Service Pipes ½ in Lead | 1/4½ | 17s | 10½d | |||||
| 3 Gas Branches with Joints | 5/. | 15s | ||||||
| 1 Gas Pendant Repairing | 5s | |||||||
| Stamping and Adjusting Weights and New Ones to replace those lost | £1 | 2s | 5d | |||||
| Size Strainer | 4s | 6d | ||||||
| Hand Barrow | 7s | 6d | ||||||
| Lot of Engine Boards 60 lbs | 3d | 15s | ||||||
| 4 Sacks of Potatoes in Loft | 10s | |||||||
| 2 Size Cans | 7s | |||||||
| 3 Paint Cans | 3s | |||||||
| Pan for Boiling Size | 5s | |||||||
| Stithey | 2s | 6d | ||||||
| Small Paper Scale (Patent) | 2s | |||||||
| Fire Guard | 4s | 6d | ||||||
| Hydraulic Press fixing and repairing | ||||||||
| 2 Ashlar Stones 13½ feet | ||||||||
| 25 feet Iron Pipe 7/8 ¼ Inch bore | ||||||||
| 2 New levers 1. 16 feet long x 6 inch diameter and the other 5 feet x 4 inches diameter | ||||||||
| Engine Spindle and Upright Shaft taking up and levelling and Engine Cover Repairing | ||||||||
| Stirring Stick | ||||||||
| 1 New Set Screw to Vat & Cog Wheel repairing and levelling | ||||||||
| Ceiling next Engine 3 ft x 2 ft x ¾ | ||||||||
| Ceiling next Old Wheel 4 ft 6 x 6 ft | ||||||||
| 1 Spout 16 feet long 13 x 12 inches | ||||||||
| Boarding round Crown Wheel 10 ft x 2 ft | 20ft | |||||||
| Shafting to Cog Wheel levelling | ||||||||
| 2 Presses Cleaning and Levers | ||||||||
| 36 feet of Iron Piping to convey Water from Cistern to Cistern | ||||||||
| Cistern Repairing | ||||||||
| 20 feet Metal Steam piping 3½ inches diameter | Cwt 2.2.20 | |||||||
| 2 Brass Taps 1 inch diameter | ||||||||
| 16 feet of Iron Piping | ||||||||
| Mountings for Boiler complete with Steam and Water Gauges | ||||||||
| Cistern getting out of River below Bridge and bringing back to Mill | ||||||||
| 20 Feet Iron Piping from Mill to Boiler | ||||||||
| Poker, Shovel etc. Boiler Cleaning | ||||||||
| New Bye Shuttle 3 ft 6. x 3 feet x 3 inches & Cog Repairing | ||||||||
| 3 Metal Pans 4 ft x 3 ft x 4 ft each with perforated Iron Plates in bottoms | ||||||||
| 1 Crow Bar. 1 Hand Jack for taking out Plates | ||||||||
| 1 Pair of Screw Spanners and Crow Bar | ||||||||
| Joiners Bench with Wood and Iron Vices | ||||||||
| 2 Latices for Sorting Ropes and Wood frame and Covered with Wire | ||||||||
| Strong Drug repairing. New Shaft top & sides | ||||||||
| 1 Barrow with loose Sides. 3 Chopping Blocks | ||||||||
| 1 Brass Tap to Boiler | ||||||||
| 1 Large Iron Ladle for ladling Size | ||||||||
| 2 Press Hooks, 3 feet long x 5/8 round | ||||||||
| Large Stool with Metal Wheels 3 ft 6 long x 2 feet wide with handle to front | ||||||||
| 3 Paper Slices | ||||||||
| 6 Lay Planks 2 ft 2 x 2 ft 8 each | ||||||||
| 2 Lay Planks 3 ft 7 x 3 ft 5 each | ||||||||
| Ceiling for Side of Engine 10 feet x 2 ft | ||||||||
| 2 Wood Pulp Raker | ||||||||
| Parting Room | ||||||||
| Parting Bench 12 feet x 3 feet with legs to the same | ||||||||
| Cutting Bench 4 feet 6 x 4 feet with Iron Plates etc. | ||||||||
| 6 Press Planks with Iron Work 3 ft x 2ft 6 each | ||||||||
| 6 Press Blocks 2 ft 6 x 8 inches square, Oak with Iron Hoops to each end & wood handle | ||||||||
| 1 Large Press Block 2 ft 6 x 2 ft x 6 inches thick with 2 handles to the same flat way | ||||||||
| 32 Red Deal Lay Boards 3 ft 6 x 2 ft 3 and Clamped together. 3 roll boxes for Engine Plates | ||||||||
| Sol | ||||||||
| Bench 10 feet long x 2 feet wide with 4 legs | ||||||||
| 4 Wood Tressels with Legs | ||||||||
| 3 Press Blocks for No. 2 Press 2 ft 6 long x 8 inch square | ||||||||
| 1 three legged stool | ||||||||
| 1 Large Chest 8 ft long x 3 feet wide x 3 feet deep | ||||||||
| 3 Oak Press Blocks for Hydraulic Press, 3 feet 3 long x 2 ft 6 wide and 4 Inches thick each | ||||||||
| 43 Iron Plates for Hydraulic Press | ||||||||
| Bevil Wheel Pattern 8 feet | ||||||||
| Bevil Wheel Pattern 2 feet | ||||||||
| 4 Hanger Pattern | ||||||||
| 4 Brass Pattern | ||||||||
| 2 Cutting Knives | ||||||||
| 3. Small Waggons with Iron Wheels | ||||||||
| 2 Boards for Bench 26 ft long x 1 x 11 | ||||||||
| 1 Table or Bench with Birch top 18 feet long. 2 ft 6 wide x 1¼ thick with strong frame to the same | ||||||||
| 7 Levers to 3 Presses in top Mill | ||||||||
| 2 Wood Pulp Rakers for Stuff Chest | ||||||||
| Mould Frame for Moulds 8 ft x 2 ft 9 | ||||||||
| 2 Chopping Blocks | ||||||||
| 2 Wood Laying Frames 2 ft 3 x 4 ft 6 inches square | ||||||||
| Lay Stools and Wheels | ||||||||
| Large Work Bench 10 feet x 2 feet 6 with legs | ||||||||
| 3 Wood Tressels | ||||||||
| 7 Press Blocks for No. 4 & 5 presses 2 ft 6 long and 6 inches square. Cutting Bench 4 ft 6 x 4 ft with Iron Plates | ||||||||
| Ladder 15 feet long | ||||||||
| Ladder 10 feet long with flat steps | ||||||||
| Ladder 6 feet long with flats steps | ||||||||
| 2 Laying Slices, Iron Rake, & 4 Paper frames | ||||||||
| 38 Lay Boards belonging to top Mill | ||||||||
| 2 Press Planks 3 feet 8 x 2 feet 4 with Iron Work | ||||||||
| 2 Press Planks 3 ft x 2 ft 4 with Iron Work | ||||||||
| Store Room | ||||||||
| 6 Large Cowbrakes for Cleaning dams out | ||||||||
| 4 Crosses for hanging Paper | ||||||||
| Lot of Iron Stakes for staking in dams | ||||||||
| 2 Hanging Stools in Drying Loft with Wheels | ||||||||
| June 7th 1865 Alfred Wilson £180.9.7½ | £180 | 9s | 7½d | |||||
| Sheffield Water Company Debtor | To Mr R. W. Marshall, Owlerton | |||||||
| Consequential Damages for Losses occasioned by the Flood March 12th 1864 | ||||||||
| Computed from March 12th 1864 to passing of Act | 4 Months | |||||||
| Time for Lodgement of Claims | £3 | |||||||
| For Completion of Assessment of Damages | 9 months from passing of act | £6 | ||||||
| For making Generel Certificate | £1 | |||||||
| For making Payment after General Certificate | ||||||||
| Loss of Rent of 2 Cottages in Mill Yard at £5.6.0 per year , 17 months | £15 | 4d | ||||||
| Loss of Rent of 1 Cottage ouside Mill Yard £ 5.6.0 per year 17 months | £7 | 10s | 2d | |||||
| Loss of Rent of 1 Cottage ouside Mill Yard £ 5.6.0 per year 14½ months | £6 | 8s | 1d | |||||
| Loss of Grinding Wheel and New Mill Rents £120 per year. 17 Months | £177 | |||||||
| Loss of Profits of Business at £40 per month 17 months | £760 | |||||||
| Rent of House at Owlerton. Ordered away by Dr. Lennard in consequence of the fever in my family. 6 Months | £7 | 10s | ||||||
| Dr. Lennards Bill for Fees for Family in Fever | £11 | 11s | ||||||
| Medicines Ordered by Dr. Lennard for Family in Fever | £2 | 1s | 11d | |||||
| Best Port Wine ordered by Dr. Lennard 3 dozen at 42/. | £6 | 6s | ||||||
| Porter etc. ordered by Dr. Lennard 8 dozen | 19s | 2d | ||||||
| Loss of Business Computed at 5 Years Profit £480 per year | £2400 | |||||||
| Loss of Fruit of Gardens and Orchard at £3 per year for 4 years | £12 | |||||||
| Cost of Removing from Owlerton to Walkley and 2 Mens Wages | £1 | 1s | ||||||
| Cost of Removing Back to Owlerton from Walkley | £1 | 1s | ||||||
| Loss of Interest on Stock Washed away £245.15.0 to the time of making award 13 Months (less 6 months Credit) 7 Months at 5% | £7 | 3s | 8d | |||||
| Writing Paper | 3s | |||||||
| Wire Trellis and Bucket (Top Mill Shed) | £1 | 2s | 6d | |||||
| Walls built of Coarse Rubble stone in Mortar Length 24 feet 6 x 11 feet 6. by 11 feet high from the floor to pan. Roof. 1 pair of Principles pans, spans, side trees etc. spouts and conductors to back. Covered with Grey Slates Pointed with hair and mortar and collaring to gable ends. Floor and Joists and boards in the roof to form hen place and hen nests. Door and Door frame hung with bands and hooks, Handle and Lock etc. Floor pitched with random pitching. 1 Steam door and door frame fixed in roof. 1 Large Pan setting inside in brickwork and Chimney Spout and hopper to Pan | ||||||||
| Walls built of rubble stone in Mortar. Length 14 feet x 8 feet 6. covered with Grey Slates. Wood Roof to the same. The floor half flagged and half boarded up with boards. 2 Posts and Batten Door hung with bands and hooks fastenings etc. divide the Yard in 2 parts. 2 Stone Troughs | ||||||||
| Walls built of rubble stone in Mortar 14 feet x 5 feet. Wood Roof, Pans, Spans, side trees, and Grey Slated. | ||||||||
| Water Wheel Repairing Necks taking up and levelling | ||||||||
| Water Wheel 31 feet long 7 x 1½ Deal | ||||||||
| Valuation of Evergreen Shrubs | ||||||||
| Work lost at School 2/6 2 Sets of Ivory Knives and Forks getting up 11/. | 13s | 6d | ||||||
| Writing Desk 10/. Ladies Satchel and Book 10/6 Skirt 5/. | £1 | 5s | 6d | |||||
| To R. W. Marshall | Owlerton | |||||||
| June 4 | White Lead 3d 1 Plate for Cistern. 1½ lb at 4d | 9d | ||||||
| To taking dimension of Work Occasioned by the Flood and Making Calculations of Cost | £2 | 10s | ||||||
| To R. W. Marshall. Owlerton | ||||||||
| Waste Paper | 434 lbs @ 2d | £3 | 15s | 8d | ||||
| Waterproof Paper 8 Rolls 30 lbs each | 240 lbs @ 6d | £6 | ||||||
| Twine | 4 lbs | 4s | ||||||
| Water Fountain for Fowls | 2s | 6d | ||||||
| Wood Press fixing in Sol | ||||||||
| Wood Beating Stool for beating felts | ||||||||
| Wright Shaft Pattern 10 feet long x 6 inch | ||||||||
| Triangles for Scales | ||||||||
| Zinc Plates for pressing | 56 lbs @ 3d | 14s | ||||||
| £5633 | 6s | 5½d | ||||||
| Assessed at | ||||||||
Note: Line 119: 'Rezin' [sic]
Corrections? Let us know >
|
|
|
|