Nature
of Claimant’s Interest |
|
Particulars
of Claim |
Amount
of Damages Claimed |
|
| |
Lessees |
|
First Schedule to the Claim of Messrs. Richard Groves and Sons relating to the Bradfield Wheel and the Land and River Banks belonging thereto |
|
|
|
|
| |
|
Mason and Bricklayers Work |
|
|
|
|
| |
|
18 Cube Yards Excavations for Foundations |
£1 |
|
|
|
| |
|
20 Roods Rubble Stone Foundation Walls @ 33/. Per rood |
£35 |
|
|
|
| |
|
114 Cube Yards Rubbish for and filling in Wheel to floor level @ 1/6 per yard |
£8 |
11s |
|
|
| |
|
48¼ Roods Hammer drest Walling backed with Rubble @ 40/. Per rood |
£96 |
10s |
|
|
| |
|
4½ Roods Rubble Stone Walling @ 35/. Per rood |
£7 |
17s |
6d |
|
| |
|
199 Superficial Yards Tooled Sills, heads & thresholds to doors and windows @ 1/2 per foot |
£11 |
12s |
2d |
|
| |
|
23 Lineal feet String and Blocking course to Chimney Tops 6 x 4 @ 1/2 per foot |
£1 |
6s |
10d |
|
| |
|
23 Lineal Yards Chimney Flues @ 3/6 per yard |
£4 |
|
6d |
|
| |
|
2 1/7 Roods Hammer drest Stone to Chimey Tops @ 40/. Per rood |
£4 |
5s |
8½d |
|
| |
|
500 Cube feet Ashlar Stone in Wheel Race Stone and Labour @ 1/6 per ft |
£37 |
10s |
|
|
| |
|
Three Common Ranges and Setting |
£1 |
10s |
|
|
| |
|
Three Chimney pipes and setting |
|
7s |
6d |
|
| |
|
Building Wheel Race and Troughs |
£40 |
|
|
|
| |
|
Carpenters and Joiners Work |
|
|
|
|
| |
|
110 Lineal feet Tie Beam 12 x 6 @ 1/3 per foot |
£6 |
17s |
6d |
|
| |
|
154 Lineal feet Principal Rafters & King Posts 11 x 3 @ 7d per ft |
£4 |
9s |
10d |
|
| |
|
36 Lineal feet Queen Posts 9 x 3 @ 5d per ft |
|
15s |
|
|
| |
|
82 Braces 3½ x 3 @ 2½ per ft |
|
17s |
1d |
|
| |
|
9 1/3 Squares Framing Principals @ 8/. Per Square |
£3 |
14s |
8d |
|
| |
|
Bolts to 4 Pairs of Principals |
£1 |
|
|
|
| |
|
208 Lineal feet Side Trees 8 x 6 @ 10/. per ft |
£8 |
13s |
4d |
|
| |
|
155 Lineal feet Wall Plates 4½ x 3 @ 3d per ft |
£1 |
18s |
9d |
|
| |
|
54½ Lineal feet Ridge Board 5½ x 1 @ 1d per ft |
|
4s |
6½d |
|
| |
|
1292 Lineal feet Spars 3 x 2¼ @ 1¾ per ft |
£9 |
8s |
5d |
|
| |
|
18½ Lineal feet Squares Framing Roof @ 6/6 per square |
£6 |
|
3d |
|
| |
|
34½ Lineal feet Floor Beams 12 x 9 @ 1/11 per ft |
£3 |
6s |
1½d |
|
| |
|
324 Lineal feet Joist 7 x 2½ @ 3d per ft |
£4 |
1s |
|
|
| |
|
4½ Squares Framing Joists @ 4/6 per square |
£1 |
|
3d |
|
| |
|
41 Lineal feet Bond Timber 4½ x 3 @ 3d per ft |
|
10s |
3d |
|
| |
|
47 Superficial Yards 1 In Floor Boards grooved and tongued @ 2/3 per yard |
£5 |
5s |
9d |
|
| |
|
3 Lineal feet Gutter boarding and bearers behind Chimney |
|
4s |
|
|
| |
|
235 Superficial feet Sash Gut Windows with Casements @ 9d per ft |
£8 |
16s |
3d |
|
| |
|
52½ Superficial feet 1 Inch Batten doors @ 8d per ft |
£1 |
15s |
|
|
| |
|
44½ Lineal ft Frames 4½ x 3 @ 5d per ft |
|
18s |
6½d |
|
| |
|
Step Ladder into Chamber |
£1 |
|
|
|
| |
|
80½ Lineal ft Lintels 18 x 3 @ 10d per ft |
£3 |
7s |
1d |
|
| |
|
18 superficial feet 1 Inch Batten Trap Door on Roof @ 8d per ft |
|
12s |
|
|
| |
|
18 lineal feet Rebated Frame 6 x 3 @ 5d per ft |
|
7s |
6d |
|
| |
|
167 1/3 Superficial ft 1 Inch Batten Shutters @ 8d |
£5 |
11s |
7d |
|
| |
|
Ironmongery |
£5 |
5s |
|
|
| |
|
231 Superficial Yards Slating with Gray Slate @ 3/. Per yard |
£34 |
13s |
|
|
| |
|
18¼ Lineal Yards Ridge Stones @ 1/6 per yard |
£1 |
7s |
4½d |
|
| |
|
342 No. Glazing Common Squares @ 3d each |
£4 |
5s |
6d |
|
| |
|
1 Cwt 2 qrs 6 lbs Lead Flashings @ 32/6 per cwt |
£2 |
10s |
6d |
|
| |
|
Painting Woodwork |
£6 |
|
|
|
| |
|
355 Cube Yards Filling in Sand and River Banks washed away @ 1/6 per yard |
£266 |
14s |
|
|
| |
|
690 Cube Yards Rubble Stone River Wall @ 7/. Per yard |
£241 |
10s |
|
|
| |
|
159 Lineal Yards Rough Coping @ 2/. Per yard |
£15 |
18s |
|
|
| |
|
3 Roods Fence Wall to Garden, 5 feet high topped in Mortar @ 18/. Per rood |
£2 |
14s |
|
|
| |
|
Garden Door and Posts hung Complete |
£1 |
|
|
|
| |
|
160 Cube Yards Vegetable Soil washed of Land @ 1/6 |
£12 |
|
|
|
| |
|
Cost of Land for obtaining filling for Rivers Banks, Land etc. |
£130 |
|
|
|
| |
|
Charges of Architect and Engineer for superintending the restoration |
£40 |
|
|
|
| |
|
Second Schedule to the Claim of Messrs. Richard Groves and Sons relating to the Millwright Work of Broadhead Wheel |
|
|
|
|
| |
|
New Water Wheel, 1 New Pit Wheel and bearings for Shaft |
£139 |
1s |
|
|
| |
|
New Wood Pentrough with Breast Shuttles |
£45 |
14s |
|
|
| |
|
2 Hollow Wheels, 2 Bevil Nuts, 2 Iron Shafts and Pedestal and Caps for the same |
£44 |
4s |
11d |
|
| |
|
5 Saw Grinder Troughs with Drums Complete, 5 File Grinders Troughs with Drums Complete |
£140 |
|
|
|
| |
|
2 Drums and Shafting in Chamber, 1 Step Ladder into Chamber, 1 Metal Trough on Hill, 2 Gig Bands, 1 Circular Machine and Frame for Glazing, 2 Glazer Machine Frames |
£84 |
10s |
7d |
|
| |
|
Third Shedule to the Claim of Messrs. Groves and Sons, relating to the Dam Goights etc. in the joint occupation of Mr Huntsman and Messrs. Groves and Sons. |
|
|
|
|
| |
|
891 Cube Yards filling in part of Bed of Dam washed away @ 1/. Per yard |
£44 |
11s |
|
|
| |
|
71¼ Cube Yards Rubble Stone Wall to form Dam Bank @ 5/. Per yard |
£17 |
16s |
3d |
|
| |
|
487¼ Cube Yards Forming outside of Bank @ 1/6 per yard |
£36 |
10s |
10½d |
|
| |
|
248 Cube Yards Puddling Dam Bank @ 2/6 per yard |
£31 |
|
|
|
| |
|
539¼ ft Ashlar for making good forebay @ 1/6 per yard |
£40 |
8s |
10d |
|
| |
|
100 Cube Yards Filling and making good Road @ 2/6 per yard |
£12 |
10s |
|
|
| |
|
20 Cube Yards Retaining Wall to protect Grinding Wheel @ 7/. Per yard |
£7 |
|
|
|
| |
|
339½ Cube Yards Boundary Walling to Road Wash and Bye Wash @ 5/6 per yard |
£93 |
7s |
3d |
|
| |
|
7 1/7 Roods Fence Wall 5 feet high topped in Mortar @ 18/. Per rood |
£6 |
8s |
7d |
|
| |
|
2 dozen Tapers 7 |
2/10 5/8 |
|
|
|
|
| |
|
½ dozen Mill 14 |
8/. 12/. |
|
|
|
|
| |
|
8 dozen Tapers 4 |
10d 6/8 |
|
|
|
|
| |
|
9 Roods Stone Walling for making good Culvert to Bye Wash @ 20/. Per rood |
£9 |
|
|
|
| |
|
18 Superficial Sheeting to Bye Wash @ 4/. Per yard |
£3 |
12s |
|
|
| |
|
9 2/3 Roods Stone Arches to Bridges Acroos Wheel Race and Wash including Centres @ 30/. Per rood |
£14 |
10s |
|
|
| |
|
109 Cube Yards Abutment Walls and Backing @ 7/. Per yard |
£38 |
3s |
|
|
| |
|
2½ Roods Spandrill Walls @ 40/. Per rood |
£5 |
|
|
|
| |
|
2 1/7 Roods Parapit Walls @ 40/. Per rood |
£4 |
5s |
8½d |
|
| |
|
20 Lineal Yards Stone Coping @ 3/. Per yard |
£3 |
|
|
|
| |
|
Making Surface of Road with Gravel |
£10 |
|
|
|
| |
|
Clearing out Dam and Byewash |
£10 |
|
|
|
| |
|
Making good Bye Shuttle and Wash |
£10 |
|
|
|
| |
|
500 Superficial Yards Pitching Slope of Dam Bank when excavated @ 9/. Per yard |
£18 |
15s |
|
|
| |
|
68 Cube Yards Filling in Wash Next Nilson's Mill @ 1/6 per yard |
£5 |
2s |
|
|
| |
|
Refixing Stone Sill at head of Wash |
|
10s |
|
|
| |
|
New Oak Sill and piles at foot of same |
£5 |
|
|
|
| |
|
33 Superficial yards Sheeting piles at foot of sill @ 4/. Per yard |
£6 |
12s |
|
|
| |
|
17 Roods Fence Wall to Dam Bank 4 ft high topped with Mortar@ 15/. Per rood |
£12 |
15s |
|
|
| |
|
[Total for 3rd Schedule] £445.17.6 |
|
|
|
|
| |
|
[Claiming] One Half |
£-222 |
-18s |
-9d |
|
| |
|
Fourth Schedule to the Claim of Messrs. Groves and Sons relating to Tools and Grindstones |
|
|
|
|
| |
1864 March |
11 Scorching Boards |
3/6 each |
£1 |
18s |
6d |
|
| |
|
13 Back Saw Board for Glazing |
6d each |
|
6s |
6d |
|
| |
|
32 Hand Saw Board for Glazing |
6d each |
|
16s |
|
|
| |
|
10 Long Saw Board for Glazing |
5d each |
|
4s |
2d |
|
| |
|
6 Back Saw Board with Tongs |
9d each |
|
4s |
6d |
|
| |
|
21 Back Saw Board Oak |
6d each |
|
10s |
6d |
|
| |
|
56 Back Saw Board for Grinding |
9d each |
£2 |
2s |
|
|
| |
|
34 Long Saw Board for Grinding |
1/. Each |
£1 |
14s |
|
|
| |
|
4 Sieves |
1/9 each |
|
7s |
|
|
| |
|
6 Emery Boxes |
6d each |
|
3s |
|
|
| |
|
2 Glazers and Axletrees |
50/. Each |
£5 |
|
|
|
| |
|
2 Glazers Pulllies each 19. 20 |
4½ each |
|
14s |
7½d |
|
| |
|
2 Glazers Housings |
4/. Each |
|
8s |
|
|
| |
|
1 Long Saw Box |
|
7s |
|
|
| |
|
0.2.14 Emery |
@ 24/. Cwt |
|
15s |
|
|
| |
|
1 Glazed Squat Board |
|
2s |
6d |
|
| |
|
2 Glazed Bands |
25/. Each |
£2 |
10s |
|
|
| |
|
2 Large Spanners 95½ lbs |
@ 5d |
£1 |
19s |
9½d |
|
| |
|
2 Short Spanners 70 lbs |
@ 5d |
£1 |
9s |
2d |
|
| |
|
8 Circular Boards |
@ 8d each |
|
5s |
4d |
|
| |
|
3 Circular Boards with tongs |
@ 2/. Each |
|
6s |
|
|
| |
|
1 Large Gavelock |
@ 7/6 |
|
7s |
6d |
|
| |
|
2 Short Gavelock |
@ 3/. Each |
|
6s |
|
|
| |
|
1 Box for carrying Hand Saws |
|
12s |
|
|
| |
|
3 Line Troughs |
@ 10/. Each |
£1 |
10s |
|
|
| |
|
5 Grinding Housings |
@ 44/. Each |
£11 |
|
|
|
| |
|
5 Sets of Screw Plates and Axletrees |
£20 |
|
|
|
| |
|
10 Hand Stocks or Standards |
@ 7/. Each |
£3 |
10s |
|
|
| |
|
19 Pair Crates |
@ 4/. Each |
£3 |
16s |
|
|
| |
|
3 Buckets and 4 kits |
@ 2/6 each |
|
17s |
6d |
|
| |
|
5 Squat Boards |
@ 5/. Each |
£1 |
5s |
|
|
| |
|
4 Pair Swings |
|
4s |
|
|
| |
|
3 New Grinding Bands |
@ 4/. Each |
£6 |
3s |
|
|
| |
|
2 New Grinding Bands |
@ 20/. Each |
£2 |
|
|
|
| |
|
5 Hack Hammers |
@ 4/. Each |
£1 |
|
|
|
| |
|
1 Hack Hammer Eye |
|
|
9d |
|
| |
|
7 Footsteps |
@ 1/6 each |
|
10s |
6d |
|
| |
|
1 Barrow |
|
15s |
|
|
| |
|
5 Pair Chains |
@ 9/. |
£2 |
5s |
|
|
| |
|
Old Sofa |
|
5s |
|
|
| |
|
1 Hoe and 2 Hooks |
|
3s |
6d |
|
| |
|
1 Stone Chisel 1¼ lb |
@ 1/. Per lb |
|
1s |
3d |
|
| |
|
Grease |
|
7s |
6d |
|
| |
|
Machine for Circular Glazing |
£10 |
10s |
|
|
| |
|
New Band for Circular Glazing |
£1 |
15s |
|
|
| |
|
1 Pulley with Metal Arms each 20, 22, 24, 26, 28, 30, 32, 34, 36, 38 = 290 Inches |
@ 5d per Inch |
£6 |
|
10d |
|
| |
|
1¼ dozen Flat 16 |
11/3 14/1 |
|
|
|
|
| |
|
1 dozen Flat 13 |
6/6 13/. |
|
|
|
|
| |
|
[Total claimed for Ground Files] |
£3 |
17s |
11d |
|
| |
|
Files Unground |
|
|
|
|
| |
|
2 Solid Pullies each 20, 28, 35. 1 Solid Pullies each 19, 22, 25, 26, 27, 29, 30, 31, 32, 34, 39. 3 Solid Pullies 23 = 549 Inches |
each 4½d |
£10 |
5s |
10d |
|
| |
|
2 Guages |
5/. & 2/. |
|
7s |
|
|
| |
|
3 Oil Cans |
1/. |
|
3s |
|
|
| |
|
1 Large Tool Chest |
|
10s |
|
|
| |
|
1 Suet Box 1 Cog Wheel 2 Cwt 4/6 9/. |
|
10s |
|
|
| |
|
2 Hand Saws in use 2/.( 4/.) Glue Pot 9d 1 Ladder 5/. |
|
9s |
9d |
|
| |
|
1 Hammer 3lb 3/. 1 Spade 3/. 1 Pair Pincers 1/. |
|
7s |
|
|
| |
|
File Grinders Tools |
|
|
|
|
| |
|
2 Lime Kits 2/6 5/. 3 Water Kits 2/6 7/6 2 Buckets 2/6 5/. |
|
17s |
6d |
|
| |
|
3 Squat Boards 3/. 9/. 1 Hook and Rake 2/6 |
|
11s |
6d |
|
| |
|
13 Pair Crates 3/. 1/19/0 3 Sets Screws and Plates 2/./. 6/./. |
£7 |
19s |
|
|
| |
|
3 Housings 30/. 4/10/0 3 Sets Metal Bosses and 2 Nuts 2/.6/. |
£4 |
16s |
|
|
| |
|
1 Spanner 24 lb 5d per lb 10/. 3 Shelves 3/. 9/. 1 Lead Ladle 2/. |
£1 |
1s |
|
|
| |
|
3 Chisels 8 lbs 3 Small Spanners 60 lbs 5d 1/5/0 |
£1 |
9s |
8d |
|
| |
|
2 Large Spanners 80 lb 5d 1/13/4 2 Hammers 10 lb 6d 5/. |
£1 |
18s |
4d |
|
| |
|
1 Pulley 30, 28, 24, 23, 20, 19, 18, 13, 14 . 2 Pullies 26, 21, 17, 16, |
@ 4½d |
£6 |
10s |
10½d |
|
| |
|
3 ½ Pair Chains |
@ 7/6 |
£1 |
6s |
3d |
|
| |
|
7 lb Racing Steel 5d 2/10 1 Riddle 2/. |
|
4s |
4d |
|
| |
|
1 Stone each 13 hands 30/. 16 Hands 60/6 |
£4 |
10s |
6d |
|
| |
|
1 Stone each 11 hands 2 Inch 20/. 1 Stone each 15 hands 3 Inch 2/15/0 |
£3 |
15s |
|
|
| |
|
1 Stone each 16 hands 1 Inch 3/0/6 |
£3 |
|
6d |
|
| |
|
1 Stone 10 hands 15/. 6 Stones Holing 3/. |
|
18s |
|
|
| |
|
6 Stones Carting 4/. Per stone |
£1 |
4s |
|
|
| |
|
Grindstones on the Hill sent to Loxley Wheel in February 1864 Washed Away |
|
|
|
|
| |
|
1 Grindstone 16 hands 1 Inch 3/0/6 3 Grindstones 16 hands 8/11/0 |
£14 |
11s |
6d |
|
| |
|
1 Grindstone 15 hands 3 Inch 2/15/. 1 Grindstone 14 hand 1/19/. |
£4 |
14s |
|
|
| |
|
6 Stones holing 6d each 3/. 6 Stones Carting 4/. Per Stone 24/. |
£1 |
7s |
|
|
| |
|
In the Troughs at the Time of the Inundation |
|
|
|
|
| |
|
14 lbs Scorchng Plates 0/3 lb. 2 Grindstones 40 Inches in use 16/. 1/12/0. 2 Grindstones 51 Inches in use 30/. 3/./. |
£4 |
12s |
|
|
| |
|
1 Grindstone 39 Inches 15/. 1 Grindstone 5 ft 8 new 3/7/7 |
£4 |
2s |
7d |
|
| |
|
1 Grindstone 6 ft 1 New 4/./. 1 Grindstone 5 ft 5 New 2/18/3 |
£6 |
18s |
3d |
|
| |
|
1 Grindstone 5 ft 7 3/4/6 2 Grindstones 5 ft 7 64/6 6/9/0 |
£9 |
13s |
6d |
|
| |
|
1 Grindstone 5 ft 8 3/7/7 |
£3 |
7s |
7d |
|
| |
|
Less Tools forund since the Flood and recovered |
£-17 |
-11s |
-3d |
|
| |
|
Expenses in Recovering and Repairing the Tools |
£1 |
3s |
|
|
| |
|
George Hawksleys Charge for estimating the Value of the above |
£3 |
3s |
|
|
| |
|
Fifth Schedule to the Claim of Messrs. Groves and Sons, relating to Goods washed away |
|
|
|
|
| |
|
Sayles. Files Ground |
|
|
|
|
| |
|
3 dozen Square 4½ |
1/. 3/. |
|
|
|
|
| |
|
12 dozen Square 3. |
7d 7/. |
|
|
|
|
| |
|
1 Hand 12. |
5/8 |
|
|
|
|
| |
|
5 dozen Horse Rasps 14. |
7/. 1/15/0 |
|
|
|
|
| |
|
2 dozen Mill 8 2/. 11 4/. |
12/. |
|
|
|
|
| |
|
2 dozen Flat 16. |
11/3 1/2/6 |
|
|
|
|
| |
|
3 dozen Round 14. |
6/1 18/3 |
|
|
|
|
| |
|
¼ dozen Round 18. |
12/9. 3/2 |
|
|
|
|
| |
|
1 dozen Equalling 8. |
2/2 |
|
|
|
|
| |
|
2 dozen Square 12. |
4/. 8/. |
|
|
|
|
| |
|
[Total Claimed for Ground Files] |
£5 |
16s |
9d |
|
| |
|
Files Unground |
|
|
|
|
| |
|
20 dozen Flat 14. |
7/. £7 |
|
|
|
|
| |
|
2 dozen ½ Round 16. |
9/10 19/8 |
|
|
|
|
| |
|
2 dozen ½ Round 12 |
4/3½ 8/7 |
|
|
|
|
| |
|
1 dozen ½ Round 14 |
6/4 |
|
|
|
|
| |
|
3 dozen Flat 10 |
2/10 7/6 |
|
|
|
|
| |
|
2 dozen Square 12 |
3/6½ 7/1 |
|
|
|
|
| |
|
4 dozen Square 9 |
1/6 6/. |
|
|
|
|
| |
|
½ dozen Featheredge 6 |
1/6 9d |
|
|
|
|
| |
|
3 dozen Hand 14 |
8/2 1/4/6 |
|
|
|
|
| |
|
2 dozen Round 10 |
1/10 3/8 |
|
|
|
|
| |
|
4 dozen 3 Square 4 |
6d 2/. |
|
|
|
|
| |
|
4 dozen Tapers 3 |
5d 1/8 |
|
|
|
|
| |
|
2½ dozen Round 9 |
2/. 5/. |
|
|
|
|
| |
|
2 dozen Mill 11 |
3/6 7/. |
|
|
|
|
| |
|
[Total claimed for unground Files ] |
£11 |
19s |
9d |
|
| |
|
Broadhead. Files Ground |
|
|
|
|
| |
|
1 dozen Horse Rasps 14 |
1/. 7/. |
|
|
|
|
| |
|
1 dozen Flat 14 |
7/9 7/9 |
|
|
|
|
| |
|
1 dozen ½ Round 14 |
1/3 7/3 |
|
|
|
|
| |
|
1½ dozen ½ Round 12 |
5/. 7/6 |
|
|
|
|
| |
|
6 dozen Tapers 3 |
7d 3/6 |
|
|
|
|
| |
|
4 dozen Hand 14 |
8/2 1/12/8 |
|
|
|
|
| |
|
8 dozen Flat 14 |
7/. 2/16/0 |
|
|
|
|
| |
|
4 dozen Horse Rasps 14 |
6/2 1/4/0 |
|
|
|
|
| |
|
3 dozen Gullet 6 |
1/4 4/. |
|
|
|
|
| |
|
2 dozen Tapers 3 |
5d 10d |
|
|
|
|
| |
|
2 dozen 3 Square 4 |
6d 1/. |
|
|
|
|
| |
|
2 dozen 3 Square 6 |
1/6 3/. |
|
|
|
|
| |
|
2 dozen Mill 12 |
4/7 9/2 |
|
|
|
|
| |
|
4 dozen Flat 8 |
1/8 6/8 |
|
|
|
|
| |
|
1 dozen Flat 10 |
2/10 |
|
|
|
|
| |
|
2 dozen Flat 9 |
2/3 4/6 |
|
|
|
|
| |
|
2 dozen Square 12 |
3/6½ 7/1 |
|
|
|
|
| |
|
1 dozen ½ Round 9 |
2/. |
|
|
|
|
| |
|
1 dozen Flat 6 |
1/. |
|
|
|
|
| |
|
1 dozen ½ Round 16 |
9/10 |
|
|
|
|
| |
|
[Total claimed for Unground Files] |
£8 |
5s |
3d |
|
| |
|
Saws |
|
|
|
|
| |
|
3 dozen Hand 26 Inch Smithed 12/6 1/17/6 2½ diameter 24 dozen Hand 11/6 1/8/9 |
3.6.3 |
|
|
|
|
| |
|
4 5/12 dozen Hand 26 Hammered 18/. 3/19/6 10/12. dozen 22. 14/3 11/11 |
4.11.5 |
|
|
|
|
| |
|
1½ dozen Hand 20 Hammered 12/10 19/3 2 1/6 dozen 18. 9/4½ 20/3 |
1.19.6 |
|
|
|
|
| |
|
1 1/6 dozen Hand 16 Hammered 8/4 9/8 ½ dozen 28 19/2 9/7 |
0.19.3 |
|
|
|
|
| |
|
6 Pit Saws 7 ft x 12 Inch heel 9/6 |
2.17.0 |
|
|
|
|
| |
|
2 Frame 5¼ x 12 7/4 |
0.14.8 |
|
|
|
|
| |
|
4 Circulars 8. 16/9 |
1.7.0 |
|
|
|
|
| |
|
1 Tailed Pit Saw 5½ ft Smithed 4/2 |
0.4.2 |
|
|
|
|
| |
|
[Total claimed for Saws] |
£15 |
19s |
3d |
|
| |
|
Per Centage for getting up lighting etc. |
10% |
£4 |
11s |
11d |
|
| |
|
Tool Box 2/6 1 New Hack Hammer 3/6 |
|
6s |
|
|
| |
|
|
|
£2007 |
14s |
6d |
|
| |
|
|
|
|
|
|