Appendix to claim #5737 – Particulars

  No. of Claim Name of Claimant Description of Claimant Address of Claimant  
  5737 Francis Huntsman Steel Refiner Attercliffe, Sheffield  
  Nature of Claimant’s Interest   Particulars of Claim Amount of Damages Claimed  
  Lessee   Schedule No. 1. Referred to in the Annexed Claim        
    5 Cube Yards Excavations for Foundations   10s    
    7 & one third Roods Rubble Foundation Walls @ 35/. Per rood £12 16s 8d  
    44¾ Roods Hammer Drest Walling Backed with Rubble @ 40/. Per rood £89 10s    
    10 Roods Rubble Stone Walling Pointed @ 35/. Per rood £17 10s    
    11 Roods Hammer drest Walling to Cart to Coke Shed @ 35/. Per rood £19 5s    
    194 & one third superficial feet Tooled Window Sills, Heads and Jambs and door thresholds @ 1/2 per ft £11 6s 9d  
    75 superficial feet Tooled heads to Circular Windows @ 1/9 per ft £6 11s 3d  
    600 Cube feet Stone in Wheel Race, Stone & Labour @ 1/6 per ft £45      
    240 Superficial feet taking down and resetting old Ashlar @ 6d per ft £6      
    21 Superficial Yards Pitching Stable Floor @ 4/. Per Yard £4 4s    
    7 Lineal Yards Channelling to the same @ 2/6 per Yard   17s 6d  
    5 No. Relieving Arches to Circular Headed Windows £2 10s    
    Building Hearth and Chimney Complete £45      
    Carpenters & Joiners Work        
    162½ Lineal Feet Tie Beams 12 x 6 @ 1/3 per ft £10 3s 1d  
    17 Lineal Feet Tie Beams 8 x 6 @ 10d per ft   14s 2d  
    227½ Lineal Feet Principal Rafters and King Posts 11 x 3 @ 7d per ft £6 12s 9d  
    22½ Lineal Feet Principal Rafters and King Posts 9 x 3 @ 5d per ft   9s 4½d  
    50 Lineal Feet Queen Posts 9 x 3 @ 5d per ft £1   10d  
    117 Lineal Feet Braces 3½ x 3 @ 2½d per ft £1 4s 4d  
    17¼ Squares Framing Principals @ 8d per square £6 18s    
    Bolts to 6 Pairs of Squares framing Principals £1 10s    
    278 Lineal Feet Side Trees 8 x 6 @ 10d per ft £11 11s 8d  
    268 Lineal Feet Wall Plates 4½ x 3 @ 3d per ft £3 7s    
    91½ Lineal Feet Ridge Board 5½ x 1   7s 7½d  
    1973 Lineal Feet Spars 3 x 2¼ @ 1¾d per ft £14 7s 8d  
    29 Squares Framing Roof @ 6/6 per Square £9 8s 6d  
    150 Lineal Feet Floor Joists 7 x 2½ @ 3d per ft £1 17s 6d  
    2 Squares Framing Joists @ 3/6 per square   7s    
    21 Superficial Yards Floor Boards grooved & tongued @ 2/3 per yard £2 7s 3d  
    14 Lineal Feet Drest hollow pan 12 x 12 @ 3/. Per ft £2 2s    
    4 Lineal Feet Gutter Boarding and Bearers behind Chimneys   5s    
    111 Superficial ft 1 Inch Batten doors @ 8d per ft £3 14s    
    128½ Lineal Feet Frames to doors & Windows 4½ x 3 @ 5d per ft £2 13s 6½d  
    37 Lineal Feet Semicircular Heads to Windows @ 10d per ft £1 10s 10d  
    31 Lineal Feet Mullions 3½ x 2½ @ 4d per ft   17s    
    7½ Superficial Feet Hit & Miss Window to Stable @ 1/. Per ft   7s 6d  
    Fanlight 5/. Step Ladder into Hay Chamber 20/. Manger & Rack 2/./. £3 5s    
    7½ Lineal Feet Oak Heel Post 6 inches Square @ 1/9 per ft   13s 1½d  
    10 Lineal Feet Bottom Rail @ 1/. Per ft   10s    
    11½ Lineal Feet Ramp Top Rail @ 1/9 per ft £1   1½d  
    47½ Superficial Feet 1 inch Batten Boarding @ 8d per ft £1 11s 8d  
    17¼ Lineal Feet Lintels 18 x 3 @ 10d per ft   14s 4½d  
    36 Superficial Feet 1 Inch Batten Trap Door on Roof @ 8d per ft £1 4s    
    36 Superficial Feet Frame to Trap Door 6 x 2   15s    
    84 Superficial Feet 1 Inch Batten Shutter @ 8d per ft £2 16s    
    363 Superficial Feet Slating with Grey Slate @ 3/. Per ft £54 9s    
    30½ Lineal Feet Ridge Stone @ 1/6 per yard £2 5s 9d  
    18 No. Glazing Common Squares @ 3d each   4s 6d  
    5 cwt 0 qrts 0 lbs Lead Flashings @ 32/6 per cwt £8 2s 6d  
    Painting Wood Work £5      
    194 Cube Yards Rubbish for and filling in Land and River Bank @ 1/6 per yard £145 13s    
    703 Cube Yards Rubble Stone River Wall @ 7/. per yard £246 1s    
    Getting out Foundations and Making Coffer Dams £25      
    Roods Stone Arch to Bridge and Bye Wash @ 30/. Per rood £3 7s 6d  
    5 Cube Yards Backing @ 7/. Per yard £1 15s    
    1 & one seventh Roods Parapet Walls 5 feet high and topped in Mortar @ 18/. Per rood £1   7d  
    7 Roods Fence Wall 5 feet high topped in Mortar @ 18/. Per rood £6 6s    
    Garden Door and Posts hung complete £1      
    400 Cube Yards Vegetable Soil washed off Gardens @ 1/6 per yard £30      
    110 Lineal Yards Rough Coping @ 2/. Per yard £11      
    50 Lineal Yards Drains from Road to River @ 4/. Per yard £10      
    108 Cube yards Counter Tools to River Wall @ 7/. Per yard £37 16s    
    Making Road & Bridge   10s    
    Copy        
    Estimate of Millwrights Work on the Restoration of Broadhead Tilt to its former position, belonging to Mr Huntsman        
    Paint New Water Wheel, New Wood Pentrough Breast Shuttles, Shuttle Shafting and Shuttles Complete £221 5s 2d  
    New Blowing Water Wheel with Shaft Bearings and all Complete £154      
    Blast and Tap Pipes, Water Pipes, Grease Boxes, Grinding Stone, Frame and Gear righting £41 10s    
    New Bye Shuttles, Rims Fly Wheel and Gudgeons remedying and other incidentals £58      
    Dated October 7. 1864 George Hawksley        
    For Valuing £28      
    Schedule No. 2        
    Referred to in the Annexed Claim        
    26 Cogs 12 each 312 lbs @ 5d 6/10/. 20 Pairs tongs 120 lbs @ 4½d 2/5/. £8 15s    
    2 Boits [?] 30 lb @ 6d 15/. 4 Tail Hoops 6 Stones each 7/./. £7 15s    
    1 Bar 35 lbs @ 2d 5/10, 2 Hammers 20 lbs @ 5d 8/4   14s 2d  
    1 Hurst [?] 2 cwt 3 qrs 0 lbs each 5d per lb 7/14/. 13 Anvils 19 cwt 2 qrs 0 lbs @ 10/. £17 9s    
    7 Pellets 5.1.21 @ 10/. 2/14/0 4 T..ions [?] 1. 10/. £3 4s    
    5 Washers 5/. 6 Helve Hoops 120 lbs @ 4d £2      
    1 Tilt Hammer Head 2 Cwt £5 12s    
    2 Fire Hooks 4/. 3 Cwt old Iron @ 3/. 9/.   13s    
    Schedule No.3. Referred to in the Annexed Claim        
    891 Cube Yards Tilting in part of bed of dam, washed away @ 1/. Per yard £44 11s    
    71¼ Cube Yards Rubble Stone Wall to form dam bank @ 5/. Per yard £17 16s 3d  
    187¼ Cube Yards Forming outside of Bank @ 1/6 per yard £36 10s 10½d  
    248 Cube Yards Puddling Dam Bank @ 2/6 per yard £31      
    539¼ Cube Feet Ashlar for making good forbay @ 1/6 per ft £40 8s 10d  
    100 Cube Yards Filling in making good swards @ 2/6 per yard £12 10s    
    20 Cube Yards Retaining Wall to protect Grinding Wheel @ 7/. Per yard £7      
    339½ Cube Yards Berr [?] Walling to Road Wash and Bye Wash @ 5/6 per yard £93 7s 3d  
    7 & one seventh Roods Fence Wall 5 ft high topped in Mortar @ 18/. Per rood £6 8s 7d  
    9 Roods Stone Walling for making good Culvert to Bye Wash @ 20/. Per rood £9      
    18 Superficial Yards Sheeting to Bye Wash @ 4/. Per yard £3 12s    
    9 Roods Stone Arches to Bridges Across Wheelrace & Wash (including centres) @ 30/. Per rood £14 10s    
    109 Cube Yards Abutment Walls and backing @ 7/. Per yard £38 3s    
    Roods Spandril Walls @ 40/. Per rood £5      
    20 Lineal Yards Stone Coping @ 3/. Per yard £3      
    Making Surface of Road with Gravel £10      
    Clearing out Dam and Bye Wash £10      
    Making Good Bye Wash and Shuttle £10      
    500 Superficial Yards Pitching Slope of Dam Bank when excavated @ 9d per yard £18 15s    
    68 Cube Yards Filling in Wash next Wilson's Mill @ 1/6 per yard £5 2s    
    Refixing Stone Sill at head of Wash   10s    
    New Oak Sill & piles at foot of the same £5      
    33 Superficial Yards Sheeting at foot of Oak Sill @ 4/. Per yard £6 12s    
    4 feet high topped in Mortar @ 15/. Per rood £12 15s    
    [Total for Schedule No. 3] £445.17.6        
    Half of £445.17.6 = £222.18.9 £-222 -18s -9d  
        £1714 8s 3½d  
           