Sheffield Flood      Claims Archive
 
 

Claim for loss of property #4933 – Particulars

  No. of Claim Name of Claimant Description of Claimant Address of Claimant  
  4933 William Kirkby Peace Manufacturer Mowbray Street  
  Nature of Claimant’s Interest   Particulars of Claim Amount of Damages Claimed  
  Owner, Lessee and Employer Employer To Workmen claims for loss of Wages, as per Schedule annexed. Page 6 87.6.5        
    William Smith's Bill as follows, pulling down unsafe Buildings removing Mud and taking out burst File makers Stock, and fixing a new one        
  September To underfooting the River Wall of your Property in Harvest Lane damaged by the late Flood, as per contract 55/0/0 £55      
  September 12th to 19th William Gomersall for loan of Pumps. To 2 Sluce Pumps for W. Smith 2/. Per day 1/12/0 £1 12s    
    To various attendances to examine your River Wall preparing Specification of work to be done to make good the damage done by the Flood on the night Friday March 11th and superintending the excavation of the Works 4/4/0 £4 4s    
    2 dozen Flat Files Each 9 ["] 1¾. 13 ["] 3¾ 11d        
    4 dozen Flat Files 12" 3d 1/.        
    1 dozen Flat Files 11" 2½d 2½d        
  Owner Damage to Stock in trade as per Particulars given to the Water Works Company and stated in Schedule annexed page 4 181.7.11        
  Lessee Estimated cost of rebuilding File Shops and Steel Shed, also the Wall of the Shed adjoining the Stable, washed down.
Mason & Bricklayers Work paid W. Smith 29.0.0
Carpenter's and Joiners Work paid John Duke 20.0.0
Slaters Work paid Harrison & Chadwick 16.6.7
Plumbers Work paid William Taylor 8.10.0
1 Door not included in the above say 0.7.6
74.4.1        
  Lessee Actual cost of underfooting the River Wall undermined by the Flood, as per Schedule annexed P. 5 106.10.6        
  Owner To 1 Scale Beam To 1 Pair Bellows } Supposed to be with the debris, but not found at cleaning £2 [Beam] £2.5.0 [Bellows]        
    [Total] £453.13.4        
    Particulars of the Stock in Trade referred to in W. K. Peace's claim. Damage done by bursting of Bradfield Reservoir        
    Files        
  Hand Smooth Files 10 ["] ¼ [dozen @] 9/. [per dozen]. 13 ["] one twelfth [dozen @] 10/9 [per dozen]. 16 ["] one third [dozen @] 26/. [per dozen]. 0.12.1¾        
  Hand Smooth Files 2nd Cut 12 ["] one sixth [dozen @] 11/. [per dozen]. 14 ["] one sixth [dozen @] 16/6 [per dozen]. 0.4.7        
  Flat Smooth 7 ["] one sixth [dozen @] 4/6 [per dozen]. 12 ["] one sixth [dozen @] 10/8 [per dozen]. 13 ["] 1 & ¼ [dozen @] 12/7 [per dozen]. 14 ["] ¾ [dozen @] 15/6 [per dozen]. 15 ["] one sixth [dozen @] 18/.[per dozen]. 16 ["] one twelfth [dozen @] 21/8 [per dozen]. 18 ["] one twelfth [dozen @] 29/6 [per dozen]. 1.17.1        
  2nd Cut 13 ["] one third [dozen @] 11/3 [per dozen]. 14 ["] ¼ [dozen @] 14/1 [per dozen]. 16 ["] one third [dozen @] 19/8 [per dozen]. 0.13.9¾        
  ½ Round Smooth 6 ["] ½ [dozen @] 4/. [per dozen]. 7 ["] one twelfth [dozen @] 4/8 [per dozen]. 10 ["] one twelfth [dozen @] 8/2 [per dozen]. 13 ["] ½ [dozen @] 13/2 [per dozen]. 14 ["] five sixths [dozen @] 15/2 [per dozen]. 15 ["] one sixth [dozen @] 18/. [per dozen]. 16 ["] one sixth [dozen @] 21/8 [per dozen]. 1.8.9        
  2nd Cut 13 ["] one third [dozen @] 11/3 [per dozen] 14 ["] ¼ [dozen @] 13/7 [per dozen] 16 ["] 1½ [dozen @] 19/3 [per dozen] 0.8.10½        
  Topping 12 ["] one sixth [dozen @] 19/3 [per dozen] 0.2.0        
  Hand Rough 16 ["] 1½ [dozen @] 21/3 [per dozen] 0.1.9¼        
  Flat Bastard 4 ["] 3½ [dozen @] 1/10 [per dozen] 6 ["] 1 & one third [dozen @] 2/9 [per dozen] 12 ["] one twelfth [dozen @] 8/6 [per dozen] 14 ["] ½ [dozen @] 12/9 [per dozen] 16 ["] one twelfth [dozen @] 17/11 [per dozen] 1.16.7        
  ½ Round 4 ["] 1 & one sixth [dozen @] 2/2 [per dozen] 10 ["] ¾ [dozen @] 6/3 [per dozen] 0.7.2½        
  3 Square 5 ["] 1 [dozen @] 2/4 [per dozen] 0.2.4        
  Shoe Rasps 8 ["] seven twelfths [dozen @] 3/9 [per dozen] 9 ["] ¼ [dozen @] 4/8 [per dozen] 9 ["] ¼ [dozen @] 4/8 [per dozen] 8 ["] ¼ [dozen @] 3/9 [per dozen] 10 ["] one twelfth [dozen @] 5/7 [per dozen] 0.4.9        
  Mill Saw Files, Bastard 6 ["] 1 & two thirds [dozen @] 2/9 [per dozen] 12 ["] 1½ [dozen @] 8/5 [per dozen] 13 ["] eleven twelfths [dozen @] 9/11 [per dozen] 14 ["] 14 ¾ [dozen @] 12/. [per dozen] 10.3.3½        
  Mill Saw Files 2nd Cut 8 ["] 2 dozen [@] 4/7 [per dozen] 0.9.2        
  Pit 5 ["] 2 dozen [@] 2/11 [per dozen]. 8 ["] ¼ dozen [@] 5/9 [per dozen] 0.7.3¼        
  [Total]   £18.19.7½        
  Credit The above now Wasters 441 lb @ 6d per lb 11.0.6        
  [Total after Credit]   £7 19s 1½d  
  Blunt Saw Files Single Cut 4 ["] 4 ¼ dozen [@] 2/4 [per dozen]. 4½ ["] ½ dozen [@] 3/. Per dozen. 5 ["] 4 dozen [@] 3/1 [per dozen] 1.3.9        
  Taper Saw Files Single Cut 4 ["] 78 dozen [@] 1/10 per dozen. 4½ ["] 81 dozen [@] 2/2 [per dozen]. 5 ["] 34 dozen [@] 2/4 [per dozen]. 5½ ["] 9 dozen [@] 2/9 [per dozen]. 21.2.7        
  Taper Saw Files Single Cut 6 ["] 4 dozen [@] 3/1 [per dozen] 6½ ["] ¾ dozen [@] 3/4 [per dozen]. 7 ["] 2 dozen [@] 4/1 [per dozen]. 8 ["] 5 dozen [@] 5/1 [per dozen]. 2.8.5        
  [Total]   £24.14.9        
  Credit Reduced value of the above as follows        
  163¾ dozen 4 & 4½ inch @ 10d [=] 6.16.5½        
  47 dozen 5 & 5½ inch @ 1/. [=] 2.7.0        
  11¾ dozen 6, 6½, 7 & 8 inch @ 1/9 [=] 1.0.6¾ 10.4.0¼        
  [Total after Credit]   £14 10s 8¾d  
    Files Cut but not worth hardening        
  2 dozen Round Bastard Files 7 x 1½ lb per dozen 2/8 0.5.4        
  2 dozen Frame Saw Files 5 x 1½ lb per dozen 2/7 0.5.2        
  2½ Taper Saw Files 6 x 2½ lb per dozen 2/9 0.6.10½        
  [Total]   0.17.4½        
  Credit 12¼ lbs Scrap Steel @ 1½d 0.1.6½        
  [Total after Credit]     15s 10d  
    Ground Files to be stripped, or reground, will cost        
    9 dozen Flat Files under 8" 1¼d 11¼d        
    6 dozen Flat Files under 8" 1½d 9d        
    66½ dozen Flat Files 14" 4½d 1.4.0        
    10½ dozen Flat Files 16" 7d 0.6.1½        
    ¼ dozen Flat Files 18" 10½d 2½d        
    18 dozen ½ round under 8" 1½d 2/3        
    9 dozen ½ round 8" 0/3/4 1/3¾        
    2 dozen ½ round 11" 3d 6d        
    21¾ dozen ½ round 12 " 3¾d 6/9½        
    15¾ dozen ½ round 13" 4½d 5/10¾        
    36½ dozen ½ round 14" 5½d 16/8¾        
    3 & two thirds dozen ½ round 16" 8d 2/5¼        
    One third dozen ½ round 18" 11½d 3¾d        
    31 dozen Round 7" 1¼d 3/2¾        
    2½ dozen Round 7" 1½d 3¾d        
    2 dozen Round 8" 1¾d 3½d        
    8 dozen Round 14" 5½d 3/8        
    1 dozen Round 16" 8d 8d        
    2 dozen Square Files 8" 1½d 3d        
    3 dozen Square Files 14" 4½d 1/1½        
    1½ dozen Square Files 12" 3d 4½d        
    ½ dozen Square Files 16" 7d 3½d        
    ¾ dozen Square Blunt 16" 9d 6¾d        
    17 dozen 3 Square under 7" 1¼d 1/9¼        
    3 dozen 3 Square under 9" 2d 6d        
    5 dozen 3 Square under 10" 2¼d 11¼d        
    1 dozen 3 Square Each 11" 3d 14" 5½d 8½d        
    1½ dozen 3 Square Files under 12" 3¾d 5½d        
    ½ dozen 3 Square Files under 16" 8d 4d        
    One sixth dozen 3 Square Files under 18" 11½d 2d        
    1 dozen Hand Files under 10" 2½d 2½d        
    3 dozen Hand Files under 12" 3¾d 11¼d        
    ½ dozen Hand Files under 15" 7d 3½d        
    1 & 1/3 dozen Hand Files under 16" 9d 1/.        
    1¾ dozen Hand Files under 18" 1/1 1/10¾        
    ½ Dozen Mill Files under 7" 1½d ¾d        
    29 Dozen Mill Files under 9" 2d 4/10        
    18 Dozen Mill Files under 10" 2½d 3/9        
    3 Dozen Mill Files under 11" 3d 9d        
    13 Dozen Mill Files under 12" 3¾d 4/¾        
    1½ Dozen Mill Files under 13"4½d 6¾d        
    7½ Mill Files under 14" 5¼d 3/3¼        
    ½ Dozen Horse Rasps 14" 4½d 2¼d        
    3½ Dozen Cabinet Files 12" 6d 1/9        
    1 Dozen Cabinet Files 14½ 9d 9d        
    1 Dozen Equalling Files 13" 5½d 5½d        
    1 Dozen Cotton Files 1½d 1½d        
    3 Dozen Shoe Rasps 9" 1¼d 3¾d        
    1 Dozen Pit Saw Files 10" 4¼d 4¼d        
    14 Dozen Small assorted 1½d 1/9        
    [Total] £5 14s 2d  
    Additional Files rendered Wasters by being rusty and rubbed        
    ¼ Dozen Flat 2nd Cut Files 5" 2/9        
    1/3 Dozen Flat 2nd Cut Files 14" 14/1 4/8¼        
    1½ Dozen Smooth Files 8" 5/6 8/3        
    2/3 Dozen Smooth Files 9" 6/7 4/4½        
    5/12 Dozen Flat Bastard Files 6" 2/9 1/1¾        
    7/12 Dozen Mill Saw Files 6" 2/9 1/7¼        
    2/3 Dozen ½ round Smooth 10" 8/2 5/5¼        
    1/12 Dozen ½ round Smooth 14" 15/2 1/3¼        
    ½ Dozen Round Smooth 16" 21/8 10/10        
    [Sub total] 1/18/3½        
    The Above now Wasters 35lbs @ 6d 0/17/6        
    [Total] £1   9½d  
    Large Tilt Forgers Stock, burst by swelling of Wood Wedges, Stone ones 1/18        
    Small Tilt Forgers Stock broken by falling of the buildings, Stone ones 0/15/0        
    Paid to John Smith for opening & cleaning 9 pairs Bellows 5/4/1        
    Paid for ½ Gallon of Neats Foot Oil to clean Bellows 0/3/6        
    Paid to Linley & Sons. Iron Frame to Same 0/2/6        
    24 Pairs of File Makers Tongs washed away 6d 0/12/0        
    6 Pairs of File Makers Marks 0/3/0        
    Reduced Value of 12 Pairs Bellows average 10/. 6/0/0        
    Reduced Valule 3 Pairs Long Bellows 2/0/0        
    [Total] £16 18s 1d  
    The Following Goods rendered unfit removed from Sales at cost Prices        
    2 Dozen C.S. Sockett & Chisels each ½, ¾, 1 1¼, & 1½ 3/11/2        
    21 American Wedge Axes 91 lbs @ 7½d 2/16/10        
    8 American Wedge Axes 37 lbs @ 6d 0/18/6        
    6 American Wedge Axes 26 lbs @ 3d 0/6/6        
    [Total] £7 13s    
    3 Dozen G.S. Handsaws 26 12/9 1/18/3        
    1 Dozen G.S. Panel Saws 26 12/9 0/12/9        
    3 Dozen C.S. Hand Saws 26 12/6 1/17/6        
    1 Dozen C.S. Panel Saws 26 12/6 0/12/6        
    4 Dozen G.S. Hand Saws 26 17/6 3/10/0        
    1 Dozen G.S. Panel Saws 26 17/6 0/17/6        
    3 Dozen C.S. Hand Saws 26 19/. 2/17/0        
    1 Dozen C.S. Panel Saws 26 19/. 0/19/0        
    1 Dozen C.S. Panel Saws Each 16 9/9 20 11/9 1/1/6        
    ½ Dozen C.S. Panel Saws 18 10/9 0/5/4½        
    4 Dozen C.S Compass Each 10 4/. 12 4/. 1/12/0        
    2 Dozen C.S. Compass 14 4/. 0/8/0        
    [Total] £16 11s 4½d  
    1 Dozen C.S. Blue Back Each 12 60/. 14 64/. 16 72/. 9/16/0        
    1 Dozen C.S. Brass Back Each 10 72/. 12 80/. 14 90/. 12/2/0        
    ½ Dozen C.S. Brass Back 16 104/. 2/12/0        
    [Sub total] 24/10/0        
    Discount 77½ % 18/19/9        
    [Total] £5 10s 3d  
    ½ Dozen C.S. Hand Saws 26 19/. 0/9/6        
    Packing Paper 1354 lbs @ 3d 11/18/6        
    ½ Dozen Small Baskets 3/6 ½ Dozen Large Baskets 6/. 0/9/6        
    2 Dozen Besoms 3/3 0/6/6        
    4 Casks repairing 5/6 1 Packing Case washed away 7/. 0/12/6        
    [Total] £13 16s 6d  
    Melting Furnace        
    1 Casement to Pot House Window 0/6/0        
    10 Pot Boards 5/. 1 Square Rough Glass 3/6 0/8/6        
    3 Tons Common Pot Clay and leading 25/. 3/15/0        
    1 Ton Derby Clay 25/. 1/5/0        
    1¼ China Clay 45/. 2/16/3        
    150 Pot Lids 1d 12/6        
    20 Pots in Annealing Grate 1/. 14 Pots not in. 1/14        
    4 Bushels Charcoal 0/2/0        
    Bushel Measure 12/. Ingot & Bench 5/. 0/17/0        
    3 Building Boxes 15/. 1 Rainmer 1/. 0/16/0        
    1 Cask Manganese 12 Cwt @ 10/. 6/0/0        
    Part Cask Manganese 5 Cwt @ 16/. 4/0/0        
    Cwt Ground best Manganese 20/. 1/10/0        
    3 Cwt Fallen Clay 1/6 0/4/6        
    10 Tons Hard Coke 15/. 7/10/0        
    2 Tons Coal 7/. 0/14/0        
    20 Coke Baskets 20/. 12 Scrap Baskets 6/. 1/6/0        
    10 Cwt Coke Dust 19/2 2 Cwt Ground Pot 1/8 1/0/10        
    [Total] £34 17s 7d  
    Steel House, less or reduced in value this amount:        
    1 Bale Small Truss Steel 0 Cwt 1 Qtrs 27 lbs @ 30/. 0/14/9        
    Small Cross cut Saws 4 Cwt 3 Qtrs 12 lbs @ 5/. 1/4/3        
    Cask Steel Sheets 14 Gross 10 Cwt 0 Qtrs 7 lbs @ 7/. 3/10/5        
    Cask Steel Sheets 12 Gross 9 Cwt 0 Qrts 0 lbs @ 7/. 3/3/0        
    Cask Steel Rods 4 Gross 1 Cwt 0 Qrts 0 lbs @ 15/. 0/15/0        
    [Total] £9 7s 5d  
    Labour removing Goods, Washing Stock, Clearing Mud        
  March 19th Paid to 30 Men, Women & Boys 25/2/0        
  March 26th Paid to 25 Men, Women & Boys 16/2/8        
  April 2nd Paid to 11 Men, Women & Boys 7/5/0        
  April 9th Paid to 5 Men 3/4/0        
  April 23rd Paid to 3 Women 0/6/0        
    [Total] £51 19s 8d  
    Our own Horse and Cart leading away Sludge, 9 days @ 8/. £3 12s    
  March 12th Bricklayers 1 day 5/3 Labourer 1 day 3/6 0/8/9        
  March 19th Bricklayers 6½ days 34/1½ Labourer 21¼ days 74/4½ 5/8/6        
  March 26th Labourer 6 days 1/1        
  April 2nd Labourer 7½ days 1/6/3        
  April 9th Mason 4½ days 24/9 Labourer 13 45/6 3/10/3        
  April 14th Labourer 8 days clearing and opening sewers 1/8/0        
  April 23rd Labourer 8½ days clearing and opening sewers 1/9/9        
    [Total] £14 12s 6d  
    Lime for Whitewashing Shops and Cellars   3s 10d  
    Taking up Weigh Bridge, Estimated cost as agreed with Mr. Eadon £2      
    50 Circulars Printing & Postage to Customers   5s 6d  
  Credit Cash received from Messrs. W. H & J. A Eadon for Goods sold by them £-26 -1s    
    Missed after giving the foregoing Particulars to the Water Company        
    One Dutch ended Scale Beam 2/0/0        
    One Pair Circular Bellows 2/5/0        
    Particulars of cost of Underfooting River Wall. William Smith's Bill for Making Coffer Dam        
  August 27th 1864 6 Men 45 days @ 5/6 per day 12/7/6        
    Beer for Men 8d per day 1/10/0        
    Leading 1 Load Scaffolding 0/1/0        
    2 Loads extra strong Rubble & Carriage 4/. 0/8/0        
  Sept 3rd 6 Men 33¾ days 9/5/7½        
    Beer for Men 1/5/0        
    19 Loads of Clay for Puddling @ 4/6 4/5/6        
    2 Loads extra strong Rubble & Carriage 0/8/0        
    Leading 2 Pumps (2 Journeys) 0/2/0        
    25 Cwt Mortar & Carriage 5/6 0/6/10½        
  September 10th Men 28½ days 7/16/8        
    Beer for Men 0/16/0        
    Mason ½ day 0/2/9        
    2 Loads extra strong Rubble & Carriage 0/8/0        
    1 Load of Clay for Puddling 0/4/6        
    [Total] £39 7s 6d  
    John Swinscoe's Bill for Piles        
  August 25th 46 Piles 6 ft long @ 2/6 5/15/0        
  August 29th 6 Piles 8 ft (without Irons) 1/3 0/7/6        
  Sept 5th 3 Piles 9 ft (without Irons) 0/4/6        
    Thomas Lightfoot's Bill, for underfooting        
    Flockton & Abbott        
   
No. Workmen of W. K. Peace engaged to give or take one Month's Notice Amount of Compensation Claimed

Amount of Loss sustained

Average of Wages per week [Nature of Earnings]

Amount of Wages received after Flood

Amount which should have been earned
      £ s d £ s d £ s d   £ s d £ s d
335 Thomas Jenkinson Melter 10 15 14 17 10 5 12 0 0 Total Earnings in 5 weeks 42 9 7 60 0 0
205 Edward Kirk File Cutter 2 0 0 5 2 0 1 9 0 Total Earnings in 4 Weeks 0 14 0 6 16 0
217 William Booker File Cutter 1 5 0 2 2 0 1 4 0 Received 6/. for cleaning in 2 weeks 0 6 0 2 8 0
212 John Shaw File Cutter 2 0 0 1 16 0 1 10 0 Received 24/. for cleaning in 2 weeks 1 4 0 3 0 0
206 William Whittam Jnr. File Cutter 1 12 6 1 13 4 0 17 4 Received 18/8 for cleaning in 3 weeks 0 18 8 2 12 0
204 William Parker Jnr. File Cutter 1 16 0 1 16 0 1 2 0 Did not reckon from February 27 to April 9 0 0 0 1 16 0
203 John Mittin File Cutter 1 5 0 2 11 7 1 17 0 24/. cleaning & 35/5 Work in 3 weeks 2 19 5 5 11 0
181 David Lindley File Cutter 1 5 0 1 6 6 1 3 0 19/6 cleaning in 2 weeks 0 19 6 2 6 0
180 Benjamin Perry File Cutter 1 4 0 1 14 3 1 9 0 2 weeks 1 3 9 2 18 0
179 John Robson File Cutter 1 10 0 1 19 8 0 16 0 3 weeks 0 8 4 2 8 0
163 George Hobson File Cutter 1 8 0 1 11 2 1 5 0 2 weeks 0 18 10 2 10 0
160 Stephen Brailsford File Cutter 1 8 0 1 9 0 1 1 0 3 weeks 1 14 0 3 3 0
159 William Smith File Cutter 1 4 0 1 5 0 1 5 0 1 week 0 0 0 1 5 0
158 Edward Bennett File Cutter 2 13 1 2 13 1 2 5 0 4 Weeks earnings after March 12th 6 6 11 9 0 0
156 William Parker File Cutter 3 10 0 4 0 10 2 10 0 4 Weeks earnings after March 12th 5 19 2 10 0 0
153 William Worthington File Forger 3 0 0 4 10 0 1 5 0 4 Weeks earnings after March 12th 10/. for cleaning 0 10 0 5 0 0
152 John Hazlehurst File Cutter 1 5 0 0 18 8 1 2 0 Received 24/. for cleaning & 45/4 in 4 Weeks 3 9 4 4 8 0
151 Johnathan Thorpe File Cutter 2 12 6 2 12 11 2 2 6 2 Weeks 1 12 1 4 5 0
141 John Hopkinson Grinder 2 14 0 3 0 1 1 7 0 4 Weeks 2 7 11 5 8 0
140 John Mortimore Grinder 8 0 0 9 0 0 4 10 0 2 Weeks 0 0 0 9 0 0
139 Joseph Travis Grinder 5 5 0 6 0 0 3 0 0 2 Weeks 0 0 0 6 0 0
136 William Ward File Forger 1 10 0 2 1 2 0 15 0 4 Weeks 0 18 10 3 0 0
135 William Brookes File Forger 3 0 0 4 0 0 1 0 0 4 Weeks 0 0 0 4 0 0
134 George Watson File Forger 4 1 0 4 19 2 1 9 0 4 Weeks 0 16 10 5 16 0
132 Henry Wigfall File Forger 4 18 6 7 4 0 3 12 0 2 Weeks 0 0 0 7 4 0
130 John Witty File Forger 2 10 0 2 12 0 1 6 0 2 Weeks 0 0 0 2 12 0
129 Horace Barnes File Forger 4 18 6 6 10 0 3 5 0 2 Weeks 0 0 0 6 10 0
127 Henry Ward File Forger 5 15 0 8 12 0 4 6 0 2 Weeks 0 0 0 8 12 0
£113 11s 10d  
        £395 2s 8¼d  
  Certificate Granted
9 March 1865
Re-heard and Dismissed £425      

Corrections? Let us know >

 
Supported by The National Lottery through the Heritage Lottery Fund Sheffield Archives Sheffield Hallam University
Accessibility | Privacy policy